Authorization Received For Drilling At Palos Verdes


VANCOUVER - Prismo Metals Inc. has received authorization to drill the approximately 70% of the Palos Verdes vein strike length that was not previously accessible for drilling. The drill program is slated to commence in early April. The Palos Verdes is located in the historic Panuco-Copala district of the state of Sinaloa, Mexico, and is contiguous to Vizsla's property.

A crew has already been mobilized to prepare this new phase of drilling at the Palos Verdes project. Work is focusing on the installation of drill sites for a portable drill rig. A total of 2,500 meters of drilling is planned to test the strike length of the Palos Verdes vein that was not previously accessible until now.

Craig Gibson, President and CEO, said, "We are pleased to be able to access the remaining portion of the Palos Verdes concession to conduct a program to test the Palos Verdes vein along strike from the previous drilling. The program is designed to expand on the positive results from our past drilling and expand the area of the high-grade mineralized shoot to the northeast of the Palos Verdes tunnel."