Better Than Expected Results Of Grade Control Drilling Program At The Adit 5 Domain


VANCOUVER, BC - Orsu Metals Corporation reported progress of a grade control drilling program at the Adit 5 domain of the Sergeevskoe Project as part of its ongoing preparation for pilot mining. The Company completed 3505.1 meters (m) in 290 grade control ("GC") drill holes over an area of 120x100 m and to a variable depth of 5-18 m. With assays received for 257 GC holes, Orsu documented continuity and consistency of gold mineralization present in six larger mineralized bodies as well as in six thinner bodies based on: 236 GC holes intercepting 2 to 17.4 m in excess of 0.7 grams per ton gold ("g/t Au"), including: 116 GC holes intercepting 2 to 8 m in excess of 2 g/t Au, of which; 34 GC holes intercepting 2 to 8 m in excess of 5 g/t Au, of which; 14 GC holes intercepting 2 to 6 m in excess of 10 g/t Au, with best intercept of 32.55 g/t Au over 2 m

Alexander Yakubchuk, Director of Exploration, said, "We are very encouraged with the ongoing progress and results of GC drilling and quality of gold mineralization at the Adit 5 domain of Sergeevskoe. With 45.14% of analyzed holes intercepting more than 2 g/t Au, 13.23% of holes intercepting more than 5 g/t Au, and 5.45% of holes intercepting more than 10 g/t Au over 2 m, the data received so far demonstrate presence of consistent high-grade gold in multiple cross sections and bodies, a characteristic feature in each drill fence at Adit 5."