Additional Exploration Work To Commence At Bell Mountain


VANCOUVER - EROS Resources Corp. reported that it is planning additional exploration and drilling at the Bell Mountain, a permitting stage gold mine development project, located  in Churchill County, Nevada

"The purpose of the exploration programs is to potentially upgrade the existing resource base at this active, permitting stage gold mine development project, Bell Mountain." said Ron Netolitzky, CEO.

In an effort to identify satellite deposits of gold-silver mineralization at Bell Mountain, a soil geochemical survey is planned to cover approximately 992 acres (401 hectares) in near proximity and on trend with the known deposits. Eros plans to collect 1,000 soil samples on a 200 ft x 200 ft sample grid.  Where bedrock is present, a rock-chip sample will be collected. Certified reference material, blanks, duplicates, and second-lab check assays will be part of the quality control and assurance program.  Targets will be determined by anomalous gold in soil and favorable geology (silicification) where present. Reverse-circulation exploration drilling will test targets as warranted.