Agreement To Acquire The Santa Fe Project

VANCOUVER - Vizsla Silver Corp. has entered into an agreement to acquire the Santa Fe Project, including both production and exploration concessions, comprising 12,229 Ha located to the south of the Company's flagship Panuco project for a combination of cash and shares. The Santa Fe Project benefits from permitted on-site production infrastructure including an operating 350 tonne per day ("tpd") mill situated along the highly prospective Panuco – San Dimas corridor and is covered 100% with LiDAR and high-resolution aero-magnetic and radiometric surveys.

"Vizsla Silver continues to expand its land position in western Mexico along the highly prospective Sinaloa Silver Belt with the acquisition of the producing Santa Fe mine," stated Michael Konnert, President, and CEO. "With an option agreement now in place on the Santa Fe production concessions, Vizsla Silver has the potential to bolster its overall production profile well beyond the 20.2 million ounces AgEq of initial annual production envisioned for Panuco Project #1. This is supported by permitted operating infrastructure including a 350 tpd flotation plant and open-ended mineralized vein structures located right at surface. Furthermore, the mine production and historic drilling completed to date covers less than 12% of the overall Santa Fe property package. With previous geophysical surveys highlighting at least four key target areas outboard of the underground mine, the Santa Fe exploration concessions provide Vizsla Silver with increased exploration upside along trend of known mining centers. Although we continue to be active in terms of corporate development, the Company remains focused on delivering a feasibility study for Panuco in the second half of this year, with a goal of achieving first silver in the second half of 2027."