Ongoing Infill Program At The Bombore Gold Mine

VANCOUVER - Orezone Gold Corporation reported on Bomboré Gold Mine’s ongoing infill and advanced grade control program which was designed to further delineate multiple high-grade structures within the P8P9 Zone, located in central Burkina Faso. All reported intercepts are in shallow oxides and are located within 1.5km of the Bomboré processing facility.

Patrick Downey, President and CEO stated, “Following a successful first full year of production at Bomboré in 2023, where the focus was on bedding down the operation and deleveraging the balance sheet, Orezone is now looking to resume its exploration efforts at Bomboré. A recently completed structural review of the property has significantly opened up the exploration model, with an increasing focus now on delineating higher-grade structures to depth and along strike.

With current mineral reserves down to an average depth of less than 40m across 14km of strike, we see significant potential to not only increase the overall mineral inventory at Bomboré, but the potential to systematically target higher-grade mineralization within the much broader structural corridor.

While ongoing drilling in the near-term remains focused on further delineating near-surface, high-grade structures in advance of mining, we continue to rank multiple high-priority exploration targets for drilling in 2024.”